PROJECT INFORMATION
|
Project name | Honey Hill |
|
Location | 6314 14 Line, New Tecumseth, ON |
| Starting price | $900's |
|
Completion date | TBD |
|
Property type | Single Family Home |
|
Unit size range | TBD |
|
Deposit structure |
$10,000 on Signing Balance of 5% in 30 Days 2.5% in 120 Days 2.5% in 240 Days 2.5% in 370 Days 2.5% in 450 Days 5% at Occupancy |
Contact for Price List, Floor Plans & More.
Marquis Modern Towns
Honey Hill Phase 1 is a new single family home development by Highcastle Homes currently in preconstruction at 6314 14 Line, New Tecumseth. The development is scheduled for completion in 2024. Honey Hill Phase 1 has a total of 160 units. Rolling hills, parks, trails and nature is the setting for this wonderful new community nestled between Hwy 50 and Hwy 27 just north of Toronto.
This new Highcastle Homes community is designed with your family’s lifestyle in mind. Featuring a stunning collection of single detached homes on 33’ to 50’ wide lots. Each model showcases spectacular features, spacious floorplans and timeless architecture. From department stores, to the Tanger Outlet Mall, to quaint shops and local pubs and restaurants, Alliston has it all!
highlights
Pop out to run an errand, spend the day shopping, or dine at a fine restaurant. At Honey Hill, everything is at your beck and call. Secluded just enough to give you the room to breathe while still close enough to maximize convenience.
- Complete exterior caulking as required.
- Energy Star® qualified vinyl windows with screens.
- Poured concrete foundation with superior Delta System.
- Weather stripping on all exterior doors and windows.
- Large basement windows (approx. 55”x24”).
- Outside hose bib as per plan.
- Poured concrete floor.
- 8’ non-insulated garage door, as per plan.
- Water supply and drain lines.
- Spray foam insulation in ceiling space beneath living space.
- Copper wiring to Ontario Hydro specifications.
- Exterior and bathroom receptacles to have ground fault interrupt.
- Exterior weather proof electrical receptacle.
- Insulation, vapor barrier to code.
- Smoke & Strobe Combo Detectors and carbon monoxide detectors as required by code.